Fleur Builders (314) 555-0139

Home builder in Florissant, MissouriDay 1 is dirt. Day 98 is home.

New homes, additions, and garages across Florissant and North County. A fixed schedule, a photo update every Friday, and the price before ground breaks.

An empty graded lot with survey stakes between two brick ranch houses in Florissant
Survey and permitsStakes go in, the city signs off, and you get the full schedule in writing.
Day1

Drag the timelineSample schedule for a 1,900 sq ft home

What we build

Four kinds of projects. All built the same careful way.

New homes

Ranch or 1.5-story on your lot or ours, from plans we draw with you.

Size
1,400 to 3,000 sq ft
Build
12 to 18 weeks

Additions

A bedroom, a bigger kitchen, a main-floor suite for a parent moving in.

Size
200 to 800 sq ft
Build
8 to 12 weeks

Garages

Detached or attached, one to three cars, with power for an EV charger.

Size
1 to 3 cars
Build
4 to 6 weeks

Basement finishes

Family rooms, a bedroom with an egress window, a full bath.

Size
500 to 1,200 sq ft
Build
6 to 9 weeks

Ballpark it

What would your new home cost?

Slide the size and the finish level. You get the range we'd quote for a typical Florissant lot, and how long it takes.

1,2003,200 sq ft

BuilderCustom

None3 cars

Ballpark range

$380k to $430k

Plus your lot. Sample numbers for this concept; your real quote comes after we walk the lot.

Build time
14 weeks
Per sq ft
$215
Deposit
10%

No black box

Where every dollar of a build goes.

Tap a piece of the bar. You get this breakdown in your quote, line by line.

18%

Framing

Lumber, trusses, sheathing, and the crew that stands it all up. The biggest single line on most homes.

Looking up through new wood framing at blue sky as a carpenter drives a nail
A builder and a homeowner pointing at house plans on a truck tailgate at the job site

Move-in day

The day they got the keys.

Day 96

The Friday photos were the best part. We watched our house go up from two states away and never once had to chase anyone for an answer.

The Okonkwo familyNew home, Florissant · Sample review
Day 71

We needed a main-floor bedroom for my mom. They had it framed in three weeks and it was done before her lease ran out.

Rita & Dom S.Addition, Hazelwood · Sample review
Day 34

The price in the quote was the price on the last invoice. In my experience that never happens. Here it did.

Greg T.Garage, Black Jack · Sample review

Start a project

Tell us what you want to build.

Project starter

What are we building?
When do you want to start?